Maf ancillary relay wiring, Maf ancillary relay wiring -12, 4 maf ancillary relay wiring – Tyco F3200 User Manual

Page 150

Advertising
background image

F3200 Installation & Programming Manual

Document No: LT0122

Installation & Wiring

Page 8-12

5 July 2001

Issue 2.7

8.4

MAF ANCILLARY RELAY WIRING

The original (AS1603.4) F3200 has a single Warning System output and Isolate Switch,

namely the Anc3/Bells relay, configured as Bells +/-, and the “Bells Isolate” key.

It is now typical for FIPs to control two outputs, i.e. a single, External Bell, and a separate

building Warning System which produces tones to AS2220 (as specified in AS4428.1).

The MAF module has 3 Ancillary Relays. Typically, Anc 1 is used for door holders, air-

conditioning shutdown etc; Anc 2 is used for the External Bell; and Anc 3/Bells is used for

the Warning System. Wiring of the External Bell should be as per Fig 8.4.2 using Anc 2. The

Warning System is covered in Section 8.5. Anc 1 and Anc 2 each have 1 set of voltage free

contacts available on screw terminals, and a second set to which the screw terminals are not

fitted as standard. Where supervision of wiring is required, the supervision (SUP) input is

used as shown in the following figures.

Door Holder Wiring

Door holders are typically powered through normally closed contacts from the non-battery

backed supply (+VNBF). As door holders are inductive, a suppression diode should be fitted

between 0V and the door holder positive line.

Where door holders have individual manual release buttons, suppression should be fitted at

each device.

Observe polarity, the cathode of the suppression diode is connected to the

positive line.

Where supervision is required, the recommended connection is as shown in Fig 8.4.1 A or B

with a return from the furthest door holder. The alternative shown in Fig 8.4.1 A does not

supervise the loop.

The 24V relay used at the end of the loop in Fig 8.4.1 B only needs to switch low current.

"Door Holder" mode supervision "looks for" the presence of voltage when the ancillary relay

is de-energised.

Plant Relay/Solenoid Wiring

Where a plant relay is to be energised on Ancillary Relay operation it would typically be

powered through normally open contacts from a battery-backed supply.

If wiring supervision is required, it is connected as shown in Fig 8.4.2. "Load" mode

supervision looks for a resistance to 0V when the ancillary relay is de-energised. For a very

low resistance load (ref Specifications Section 3.4.2) a series diode must be fitted as shown.

Heavy Load Wiring

If a load greater than 2A resistive (1A dc inductive) needs to be controlled by F3200 then this

can be achieved with the addition of a 24V Bell Monitor Board (PA0494). This can switch up

to 5A dc (resistive) and supervises the load wiring for open and short circuit faults.

Further details for the Bell Monitor Board are contained in LT0190. A representative wiring

diagram is shown in Figure 8.4.3. If the load exceeds 2A dc then the power connection must

be taken off +VBF2 or directly off the battery terminals via a suitable fuse (but not the +VBF1

terminal). The fuse and wiring are supervised by the Bell Monitor Board, as it will generate a

fault if power to it fails.