Stakeout settings – Spectra Precision Survey Pro CE v3.6 User Manual User Manual

Page 190

Advertising
background image

Job Menu

R-33

;

Prompt to Reset Scale on New Setups

: if checked when a map

projection is selected and you set up over a new location, the specified
scale factor is compared to the scale factor defined for your current
location in the mapping plane. If the scale factor is different, you will
be prompted to use the new scale factor.

Stakeout Settings

The Stakeout Settings card contains the setting
that control how stakeout is performed.

;

Stake “Corners,” Not Just Even Intervals

:

when staking by stations, locations where a line
segment changes, such as from a straight
section to a curve, will also be staked when this
is checked.

;

Always Start Stakeout With Coarse Mode

:

When checked, the

Coarse EDM (fast shot)

checkbox found in all stakeout screens will
initially be checked. This instructs the total

station to measure distances faster, but with slightly less accuracy.

;

Use Manual Updating (Remote Control)

: When this is checked, a

6KRW button in the stakeout screens must be pressed to take a shot.

When this not checked, shots are continuously taken in the stakeout
screens. (This is only valid when running in remote mode, using a
robotic total station.)

;

Design Elevation from Offset Segment

: When checked during

offset or road stakeout, cut and fill information will be computed from
the design elevation at the node furthest from the centerline of the
current segment. When unchecked, cut and fill information will be
computed from the design elevation of the segment at the current rod
location.

Note: If staking extends beyond the end of the cross section, the cut /
fill information will always be computed from the design elevation at
the node furthest from the centerline of the current segment.

Advertising