Set up – Spectra Precision Survey Pro CE v3.6 User Manual User Manual

Page 66

Advertising
background image

User’s Manual

60

Set Up

1. Open the job that was created in the Traverse / Side Shot

Example if it is not already open.

a. From the Main Menu, select

)LOH , 2SHQ  1HZ to open the

Open / New screen.

b. Tap the file name that was created

earlier listed in the

Open Recent Job

list

and then tap



2SHQ . The coordinates for

that job are shown here.

2. Set the job settings. (Only the settings that

affect this example are covered here.)

a. Select

-RE , 6HWWLQJV from the Main

Menu.

b. Select

the

Instrument Settings

screen and

set both the

Brand

and

Model

fields to

Manual Mode

.

c. Select

the

Surveying Settings

screen and confirm that all of

the checkboxes are unchecked.

d. Select

the

Stakeout Settings

screen and make sure the

Cut

Sheet Offset Stored

field (at the bottom of the screen) is set to

Actual Offset

.

Note: When performing stakeout, you have the option of storing cut
sheet information. This information is stored in the raw data file,
and when using software on a PC, such as Survey Link, it can be
extracted in the form of a Cut Sheet Report.

e. Tap

2. to save the job settings.

3. Setup your backsight. In this example, we will setup on Point 1

and backsight an object with a known azimuth. When connected
to a total station, you would setup over your occupy point, aim
toward the backsight and zero the horizontal angle in the total
station before continuing.

Advertising