Offset staking – screen three – Spectra Precision Survey Pro CE v3.6 User Manual User Manual

Page 276

Advertising
background image

Stakeout Menu

R-119

Note: The specified curb or ditch height and offset will be applied to
both sides of the road.

 %DFN : returns to the previous screen.

1H[W ! : accesses the next screen.

Offset Staking – Screen Three

The third Offset Staking screen is used to select the station and
section of the road to be staked and to specify an offset distance from
the design point.

Station to Stake

: is the station to be staked.

Station Interval

: specifies how far to advance from the current station

to the next station.

1H[W 6WDWLRQ : advances the current station by

the

Station Interval

.

Note: When advancing, if you want to also
stake the locations where the alignment of the
road changes, be sure to check the

Stake

“Corners”, Not Just Even Intervals

option in the

Stakeout Settings card. Tapping the

6HWWLQJV

button at the top of the screen will access the
Stakeout Settings.

 / !! : These buttons are used to select the section of the road

that you want to stake.

;

Offset from the segment above ___

: When checked, is the offset

distance that will be applied to the selected design point. A positive
offset extends from the design point away from the centerline. A
negative offset extends towards the centerline.

X-Slope (%)

: is the slope of the selected road section.

Advertising