Slope staking, Slope staking – screen two – Spectra Precision Survey Pro CE v3.6 User Manual User Manual

Page 279

Advertising
background image

Survey Pro Reference Manual

R-122

Slope Staking

6WDNHRXW 6ORSH 6WDNLQJ



The Slope Staking screen is used to locate the catch points for a
roadway in any terrain.

The first screen is used to define or select the line
that describes the centerline of the road to be
slope staked. An existing polyline or alignment
can be selected, or a series of existing points can
be entered to define the centerline.

7DS /LQH« : allows you to tap an existing

polyline or alignment that defines the centerline
of the road.

7R)URP« : allows you to enter a range of points

to define the centerline of the road.

Begin Station

: defines the station at the beginning of the centerline.

%DFNVLJKW« : accesses the Backsight Setup screen.

1H[W! : opens the next screen.

Slope Staking – Screen Two

The second screen is used to describe the profile
of the road.

1/2 Road Width

: is the horizontal width of

L

eft

and

R

ight sides of the road, respectively, from the

centerline to the nearest edge of the curb or
ditch.

X-Slope

: is the cross slope of the

L

eft and

R

ight

sides of the road, respectively. The slope is

computed from (

100

Run

Rise

). (A negative slope will

cause water to run from the centerline toward the edge.)

Advertising