Road slope staking, Road slope staking – screen two – Spectra Precision Survey Pro CE v3.6 User Manual User Manual

Page 378

Advertising
background image

Roads Menu

R-221

Road Slope Staking

5RDGV 6ORSH 6WDNLQJ



The Road Slope Staking screen is used to locate the catch point of the
road at any station.

7DS 5RDG« : opens the Tap on a Road screen

where you can tap on any road in the job to
select it.

Name

: displays the name of the selected road.

Begin

Station

: displays the station assigned to

the beginning of the road.

End

Station

: displays the final station in the

road.

%DFNVLJKW« : accesses the Backsight Setup

screen (Page R-72).

1H[W ! : takes you to the next Road Slope Staking screen where the

slope staking parameters are set up.

Road Slope Staking – Screen Two

The second Road Slope Staking screen is used to
set up some slope stake parameters prior to
slope staking the road.

Station

: is the station to be slope staked.

Station Interval

: specifies how far to advance

from the current station to the next station.

1H[W 6WDWLRQ : advances the current station by

the

Station Interval

.

Advertising