Spectra Precision Survey Pro CE v3.6 User Manual User Manual

Page 68

Advertising
background image

User’s Manual

62

c. The second Stake Points screen will open

that displays all of the information
needed to locate the design point. When
connected to a total station, you would
turn the total station horizontally to
45°00’00”, vertically to 90°00’00” and
send the rod man out about 70 feet before
continuing. Tap the

6WDNH !



button to

continue to the third screen.

d. With

a

Height of rod

of

5

, tap the

6KRW



button. (See the Reference Manual for an
explanation of the other fields.)

e. Enter the following shot data:

Angle Right

:

45

Zenith: 90
Slope Dist

:

70

and then tap

2. to continue.

f. The Stake Points screen will show the

necessary

COME

/

GO

and

Go

RIGHT

/

Go

LEFT

information that the rod man

must move in order to be located over the design point. In
this example, the

Go

RIGHT

value indicates

0

, which means

the rod is precisely on the line between the total station and
the design point. The

BACK

value indicates

0.711

, which

indicates that the rod must move back (away from the total
station) 0.711 feet to be over the design point. The

Fill

value is

zero so no dirt needs to be cut or filled at the rod location to
match the design elevation.

g. Assuming the rod has been repositioned, take another shot by

tapping the

6KRW



button and enter the following new shot

data:

Angle Right

:

45

Zenith

Angle

:

90

Slope

Dist

:

70.8

and then tap

2. to continue.

Advertising