Slope staking the road – Spectra Precision Survey Pro CE v3.6 User Manual User Manual

Page 90

Advertising
background image

User’s Manual

84

9. The next screen that opens is identical to

the screens used in point staking, since
that is essentially what is occurring at this
point. If you are not familiar with Point
Staking, refer to Page 61.

10. Once the point is staked and stored, you

will return to the screen described above
where a new node can be selected and
staked or the station to stake can be
advanced by the station interval by tapping
the

1H[W 6WDWLRQ button.

Slope Staking the Road

The road slope staking procedure is nearly identical to the non-road
layout slope staking routine described on Page 118. The main
difference is the road layout templates can contain more segments,
which slightly modifies the options of where the hinge point should be
located in a situation where a fill is required.

Like with the road stakeout example above, this example describes
how to set up road slope staking and then refers you to the non-road
layout example where the screens are identical.

1. Tap

5RDGV 6ORSH 6WDNLQJ to open the Road Slope Staking screen.

2. Tap

the

7DS 5RDG« button to open the Tap on a Road screen. All

of the roads that exist in the current job will be displayed.

3. Tap on the road that you want to stake and then tap

2.. When

the road is selected, it will be drawn with a bold line.

4. If the backsight is not yet defined, tap the

%DFNVLJKW« button to

set up your backsight.

5. With the road selected, tap

1H[W ! to continue.

6. In

the

Station

field, enter the station that you want to slope stake

and in the

Station Interval

field, enter the distance that you want

the

Station

to advance when you are ready to slope stake the next

station.