Stake road – screen four – Spectra Precision Survey Pro CE v3.6 User Manual User Manual

Page 377

Advertising
background image

Survey Pro Reference Manual

R-220

Note: The

&LUFOH =HUR button is not available when using a robotic

total station.

 %DFN : returns to the previous screen.

6WDNH ! : accesses the final Stake Road screen where the shots to the

stake point are performed.

Stake Road – Screen Four

The fourth and final Stake Road screen is used to perform the shots
necessary to locate the design point. This screen is identical to the
final Stake Points screen, which is explained on Page R-108.

Advertising