Traverse Now or Later? Dialog Box

After taking a shot with the

7UDYHUVH button, the

Traverse Now or Later? dialog box will open where you
can specify if you want to traverse now or later .

7UDYHUVH 1RZ : expects you to move your total station

to the next occupy point before any additional shots
are taken. The occupy, foresight, and backsight points
will be updated accordingly.

7UDYHUVH /DWHU : allows you to take additional side shots before

moving the total station to the next traverse point. This is useful is
you want to take side shots from the current occupy point, but
perform the traverse shot as the first shot of the current set up to
ensure the highest accuracy.

When you have finished taking side shots, tap the

7UDYHUVH button

again. You can then select

7UDYHUVH 1RZ and set up on the next

occupy point, or select

6KRRW 1HZ 7UDYHUVH to re-shoot the traverse

shot.

New Occupy Point Dialog Box

After traversing to a new point, the New Occupy
Point dialog box will open that informs you of
the points that have been updated and
computes the azimuth to the new backsight.

New Backsight Circle

: displays the horizontal

angle that should be displayed on the total
station once it is set up over the

New Occupy

Point

and facing the

New Backsight Point

. This

angle is typically zero unless you are surveying
in true azimuths, as set in the Surveying
Settings screen (Page R-32).

Height of Instrument

: is the new height that the total station is above

the ground.