10.1 RELAY TEST

Allows the operator to verify that the LEDs, Relay and/or SSRD output(s) is/are working. A Volt/Ohm meter will be

required to test the output.

Step 1

With RELAY in the lower display line, depress the

and INITIATE RELAY TEST appears in the upper

display line and NO appears in the lower display line. Depress

, select YES, depress

to perform

the test.

Step 2

TEST IN PROCESS appears in the upper display line, LED 1 will be lit and Relay 1 will be energized or SSRD 1

will be on. For SPDT relays, connect the meter across the NO. and COM output terminals in the ohm scale. The

meter should read continuity with the relay on and infinitity when the relay is off. For SSRD outputs, connect the

meter across the output terminals in the Volt DC scale. The meter should read +5 VDC when the SSRD is on and

0 VDC when the SSRD is off.

Step 3

When each depression of the

advances through each available Relay and/or SSRD. All eight LEDs

should light, one after the other, as all 8 are always present.

Step 4

To exit the test, depress the

.

10.2 DISPLAY TEST

Allows the operator to verify that all dots in the VFD are working. No test equipment is required to perform this

test.

Step 1

With DISPLAY in the lower dipslay line, depress the

and INIT DISPLAY TEST appears in the upper display

line and NO appears in the lower display line. Depress

, select YES, then depress

to perform the

test.

Step 2

All dots in the vacuum fluorescent display will light. With each successive depression of the

, the display will

show 2 lines of characters, then all dots being lit, then characters, etc..

Step 3

To exit the test, depress

when the lines of characters are displayed. The instrument will return to the

normal display.