Inspection/ shipping – Agilent Technologies 75000 Series C User Manual

Page 14

Advertising
background image

Inspection/
Shipping

This section describes initial (incoming) inspection and shipping guidelines
for the AFG.

Initial

Inspection

Use the steps in Figure 1-2 as guidelines to perform initial inspection of
the AFG.

WARNING

To avoid possible hazardous electrical shock, do not perform
electrical tests if there are signs of shipping damage to the
shipping container or to the instrument.

Figure 1-2. Initial (Incoming) Inspection Guidelines

12 General Information

Agilent E1445A Service Manual

Advertising
This manual is related to the following products: