Functional verification: start arm in test – Agilent Technologies 75000 Series C User Manual

Page 23

Advertising
background image

Functional Verification: Start Arm In Test

Description

The purpose of this test is to check the Start Arm In port. The "TRIG OUT"
port of the Command Module is used to send a Start Arm signal to the AFG.

Test Procedure

1.

Reset the AFG:

*RST;*CLS

Reset AFG and clear
status registers

2.

Set up equipment as shown in Figure 2-2:

3.

Send the following commands to the Command Module to output 0 V
to the "Trig Out" port:

*RST
OUTP:EXT:STAT ON
OUTP:EXT:SOUR INT
OUTP:EXT:LEV 1

Figure 2-2. Start Arm In Test Setup

Agilent E1445A Service Manual

Verification Tests 21

Advertising
This manual is related to the following products: