General, Product registration, Hardware – Winco DGC-2020 User Manual

Page 113: Mounting, Section 6, Installation -1, Figure 6-1. panel cutting and drilling dimensions

Advertising
background image

9400200990 Rev B

DGC-2020 Installation

6-1

SECTION 6

INSTALLATION

GENERAL

DGC-2020 controllers are delivered in sturdy cartons to prevent shipping damage. Upon receipt of a
system, check the part number against the requisition and packing list for agreement. Inspect for damage,
and if there is evidence of such, immediately file a claim with the carrier and notify the Basler Electric
regional sales office, your sales representative, or a sales representative at Basler Electric, Highland,
Illinois USA.

If the device is not installed immediately, store it in the original shipping package in a moisture- and dust-
free environment.

PRODUCT REGISTRATION

Registering with Basler Electric enables you to receive important information updates on your product
plus new product announcements. Register your product by directing your web browser to

www.basler.com

.

HARDWARE

DGC-2020 controllers are packaged for mounting in any top-mount enclosure. The front panel is resistant
to moisture, salt fog, humidity, dust, dirt, and chemical contaminants. DGC-2020 controllers are mounted
using the four permanently attached 10-24 studs. The torque applied to the mounting hardware should
not exceed 25 inch-pounds (2.8 newton meters).

MOUNTING

Panel cutting and drilling dimensions are shown in Figure 6-1. The horizontal measurement of 10.75
inches has a tolerance of +0.01/-0.01 inches. The horizontal measurement of 10.25 inches has a
tolerance of +0.04/-0 inches. The vertical measurement of 7.25 inches has a tolerance of +0.01/-0.01
inches. The vertical measurement of 6.75 inches has a tolerance of +0.04/-0. Overall dimensions are
shown in Figure 6-2. All dimensions are shown in inches with millimeters in parenthesis.

Figure 6-1. Panel Cutting and Drilling Dimensions

Advertising