Installation for ce systems, Installation in a salt fog environment, Installation for ce systems -17 – Winco DGC-2020 User Manual

Page 129: Installation in a salt fog environment -17

Advertising
background image

9400200990 Rev B

DGC-2020 Installation

6-17

INSTALLATION FOR CE SYSTEMS

For CE compliant systems, it may be required to route AC voltage and current sensing wires separately
from other wires.

INSTALLATION IN A SALT FOG ENVIRONMENT

If the DGC-2020 will be installed in a salt-fog environment, it is recommended that the backup battery for
the real-time clock be removed. Salt fog is known to be conductive and may short-circuit the battery.

Information on removing the backup battery for the real-time clock can be found in Section 7,
Maintenance and Troubleshooting.

Advertising