Installation for ce systems, Installation in a salt fog environment, Installation for ce systems -17 – Winco DGC-2020 User Manual
Page 129: Installation in a salt fog environment -17
Advertising
9400200990 Rev B
DGC-2020 Installation
6-17
INSTALLATION FOR CE SYSTEMS
For CE compliant systems, it may be required to route AC voltage and current sensing wires separately
from other wires.
INSTALLATION IN A SALT FOG ENVIRONMENT
If the DGC-2020 will be installed in a salt-fog environment, it is recommended that the backup battery for
the real-time clock be removed. Salt fog is known to be conductive and may short-circuit the battery.
Information on removing the backup battery for the real-time clock can be found in Section 7,
Maintenance and Troubleshooting.
Advertising