Echelon IzoT Commissioning Tool User Manual

Page 237

Advertising
background image

the drawing has been opened, click Add-ins, point to Synchronization, click Resynchronize,
and follow steps 14–18.

14. The Synchronize OpenLNS CT Drawing dialog box opens.

15. Click Next to next to accept the default synchronization operation, which is Synchronize

Network to Database (the option for recommissioning devices). The Choose Synchronization
Scope
dialog opens.

16. Click Next to accept the default synchronization scope (all the subsystems and drawing files in the

network). The Commissioning Options dialog box opens.

IzoT Commissioning Tool User’s Guide

221

Advertising