Echelon IzoT Commissioning Tool User Manual

Page 70

Advertising
background image

5. A new random domain ID is generated. To use a specific domain ID, clear the Use Randomly

Generated Domain ID check box and enter your ID in hexadecimal format in the Domain ID
box. Click Finish.

6. If you are copying a network created with IzoT Commissioning Tool, your new IzoT

Commissioning Tool network will open and you can skip the remaining steps.

7. If the existing IzoT Commissioning Tool network design you are copying was created in a

previous version of LonMaker Turbo Editions (or earlier versions of the LonMaker tool), the
Synchronize IzoT Commissioning Tool for Windows Drawing dialog box opens. This is
because the IzoT Commissioning Tool SmartShapes in the drawing need to be updated to reflect
the current IzoT Commissioning Tool.

8. In the Synchronize IzoT Commissioning Tool for Windows Drawing dialog box, the Update

Shapes to Current IzoT Commissioning Tool Version check box will be selected by default.
Select any other desired synchronization options and click Next. The Choose Synchronization
Scope
dialog box opens.

9. Accept the defaults and click Next. The Choose Shapes and Items to Update dialog box will

appear.

10. Accept the defaults and click Finish. The Synchronization Status dialog box opens as the

synchronization process begins.

11. The Synchronization Status dialog box displays the progress of the synchronization. Once

“Synchronization Complete” opens, click OK to open your IzoT Commissioning Tool network
design.

For more information about the synchronization options in the preceding dialog boxes, see Manual
Network Resynchronization
in Chapter 7, Maintaining Networks.

Notes: If you open the copy of the IzoT Commissioning Tool network with IzoT Commissioning Tool
set OnNet, a message opens reminding you that the copy of the IzoT Commissioning Tool network
should not be attached to the physical network associated with the original. This is because the devices

54

Getting Started

Advertising