Echelon IzoT Commissioning Tool User Manual

Page 59

Advertising
background image

Tips:

• You can click Finish at any point in the Network Wizard. Doing so will skip the subsequent

series of pages, and your new IzoT Commissioning Tool network design will be created using
the current settings in the New Network Options tab of the IzoT Commissioning Tool
Design Manager.

• By default, the subsequent pages in the Network Wizard will appear each time you re-open

the OpenLNS CT drawing. Select the Skip This Prompt when Re-opening this Drawing
check box on any of the pages you want to skip when re-opening the drawing.

• You can change any options you set in the Network Wizard in the OpenLNS CT drawing.

Open the IzoT Commissioning Tool menu, click Network Properties, and then click the tab
containing the options you want to modify.

5. Edit the following information as required:

Network Name

Displays the network name. By default, this is the current name in
the Network Name box under New Network in the General tab of
the IzoT Commissioning Tool Design Manager. The default
network name is incremented if a naming conflict exists.

You can change the name of the network. The name must be unique
to the network database, and it can have a maximum of 16
characters. The network name in the Network Database Path and
Network Drawing Path fields will automatically be updated to
match the name you specify.

Recover Database
from Network

Opens the OpenLNS Database Recovery Wizard after completing
the Network Wizard. You can use the recovery wizard to create a
new OpenLNS CT drawing and network database from an existing

IzoT Commissioning Tool User’s Guide

43

Advertising