Echelon IzoT Commissioning Tool User Manual

Page 263

Advertising
background image

during Resync

network during resynchronization. This speeds up
resynchronization, as it reduces the time Visio spends updating the
drawings.

Check for
Connections for
Missing FB Shapes

Enables IzoT Commissioning Tool to check for connections to
functional blocks that are in the network database but are not
represented by functional block SmartShapes in the OpenLNS CT
drawing.

Subsystem to Visio
Document
Assignment

Select in which Visio drawing file to place the subsystems in your
network. You have four choices:

Single Visio Document for all Subsystems. Places all

subsystems in a single Visio document.

Prompt for Subsystem Document Assignment. Prompts you

to specify the Visio document for each subsystem.

Separate Document for each Subsystem Hierarchy below

Root. Places each subsystem hierarchy below the top-level
subsystem in a separate, new Visio document.

Custom. Opens the Subsystem Document Assignment dialog.

In this dialog, you specify the Visio document for each
subsystem.

12. Click Next. If you selected the Custom subsystem document assignment option, the Subsystem

Document Assignment dialog opens. Otherwise, skip to step 15 in which the Select Stencils
dialog opens.

13. Customize the drawing document assignment of subsystems found during resynchronization.

Subsystems are listed in the left hand pane listed under Subsystems, while the Visio drawing
documents are listed in the right hand pane listed under Documents. To assign a subsystem,
select the subsystem name, select the desired document name, and then click Assign Document.
To add additional drawing documents, click Add Document.

14. Click Next. The Select Stencils dialog opens.

IzoT Commissioning Tool User’s Guide

247