Echelon IzoT Commissioning Tool User Manual

Page 269

Advertising
background image

12. Select the source network you exported in steps 4 – 6 from the Select Network to be Merged list.

This list contains only those networks that have been exported using the Merge Export Utility.

13. Enter a name for the root subsystem of the source network in the Name to Be Assigned box.

14. Click Finish to begin the network merge. The source network and its underlying subsystem

hierarchy will be added as a new subsystem. The merge process copies all documents from the
source drawing directory into the destination drawing directory and renames them, as required.
The SmartShapes are then scanned and added to the destination network database. A network
merge status window opens and indicates the progress of the merge.

IzoT Commissioning Tool User’s Guide

253

Advertising