Configuration procedure, Verifying the configuration – H3C Technologies H3C MSR 50 User Manual

Page 181

Advertising
background image

The power supply priority of GigabitEthernet 3/2 is critical. If a new PD results in PSE power

overload, the PSE does not supply power to the new PD according to the default PoE interface
power management priority policy.

The power of the AP device connected to GigabitEthernet 5/2 does not exceed 9000 milliwatts.

Figure 55 Network diagram

Configuration procedure

# Enable PoE for the PSE.

<Sysname> system-view

[Sysname] poe enable pse 10

[Sysname] poe enable pse 16

# Set the maximum power of PSE 10 to 400 watts.

[Sysname] poe max-power 400 pse 10

# Enable PoE on GigabitEthernet 3/1 and GigabitEthernet 5/1.

[Sysname] interface gigabitethernet 3/1

[Sysname-GigabitEthernet3/1] poe enable

[Sysname-GigabitEthernet3/1] quit

[Sysname] interface gigabitethernet 5/1

[Sysname-GigabitEthernet5/1] poe enable

[Sysname-GigabitEthernet5/1] quit

# Enable PoE on GigabitEthernet 3/2, and set its power priority to critical.

[Sysname] interface gigabitethernet 3/2

[Sysname-GigabitEthernet3/2] poe enable

[Sysname-GigabitEthernet3/2] poe priority critical

[Sysname-GigabitEthernet3/2] quit

# Enable PoE on GigabitEthernet 5/2, and set its maximum power to 9000 milliwatts.

[Sysname] interface gigabitethernet 5/2

[Sysname-GigabitEthernet5/2] poe enable

[Sysname-GigabitEthernet5/2] poe max-power 9000

Verifying the configuration

After the configuration takes effect, the IP telephones and AP devices are powered and can operate
correctly.