5 click build – Enterasys Networks Network Card User Manual

Page 160

Advertising
background image

148

RiverMaster Administrator’s Guide

Controlling Client Synchronization

Chapter 6

Managing Users & Groups

3

Choose Build Patch Program from the toolbar on the top edge of the
pullout.

Figure 79 shows the Configuration pullout with the Build Aurorean
Client Core Data Files display selected.

Figure 79 Build Core Data Files Display

4

From the Group menu, choose the group you want to receive the new
set of core data files.

5

Click Build.

As the core files are built, status messages appear in the lower left
corner of the pullout and in the Build Status area.

Click here to view the Build Aurorean Client Core Data Files display

Click here to

view the client

update options

Click here to

open the

Configuration

pullout

View status of build here

for this group

Green

D

(data) or

S

(software)

indicates what

type of sync is

enabled. Red

D

(data) or

S

(software) means

sync is disabled

Click here to

start the build

Advertising