FEC AFC1500 User Manual

Page 147

Advertising
background image

AFC1500 Operations Manual

Chapter 8: Maintenance and Inspection (Rev. 6: 10/09)

Page 8-3

8.1.4 SAN Unit

Recommended Schedule: Quarterly

The SAN Unit requires careful use and handling. Inspect each SAN unit and ensure the fol-
lowing requirements are met:

w

The environmental conditions are within specifications.

w

There is no moisture, oil, or foreign matter on the unit.

w

The unit is securely mounted, with appropriate clearance on all sides.

w

All screws (for the cover of the unit and for mounting) are correctly tightened.

w

The input power remains within specifications at all times.

w

The unit is not producing any abnormal (excessive) heat.

w

Unit cables (on the front and the underside) are securely fastened and without damage.

8.1.5 Air Handling Units (Air Conditioner, Heat Exchanger, etc.)

Recommended Schedule: Every 2 months (sooner if external environment is harsh ie. ma-
chining area with coolant mist in air)

Equipment supporting the AFC1500 System's environment must be sufficiently maintained.
Internal electrical enclosure (which the SAN units are housed) heat load can be calculated
using the internal power consumption data in table 2.3. Verify support equipment meets the
following requirements, as applicable to the unit type:

w

The unit is free from dust, oil, and foreign matter.

w

All filtration devices are clean, and air flow is not impeded.

w

The unit is securely and correctly mounted.

w

The input power remains within specifications at all times.

w

All fans are functioning properly with no abnormal sound or vibration.

Advertising