FEC DSP1500 (SAN3) User Manual
Page 106

enFORCE
DSP1500 SAN Unit Operation Manual
(Rev 4)
PAGE 6-30
Chapter 6: System Operation
♦
Time Controlled Press (Method 5)
This Load Control press method allows a pressing operation to be performed based off
of a given time [62: Press Time].
Upon start of cycle, the press will operate until it achieves [14: Target Load]. During
the press cycle, after achieving [20: Time Start Load], the press speed will be
adjusted to achieve [14: Target Load] in proportion to the time specified in [62: Press
Time] (Example: if [62: Press Time] is set to 10 seconds, it will take 10 seconds to go
from [20: Time Start Load] to [14: Target Load])
. During the press cycle, checks are
performed for “Interference Check” / “Part Check”, Load and Distance. If any of these
values are compromised, the press will stop and return as programmed.
(See corresponding sections for Interference Check and Part Check explanations.)
This press can be done with an ‘F’ type tool but make sure not to overload.
In this special setup, [62: Press Time] is a “control” function and is not used for
judgment.
To use this method in a Step Press Operation, refer to page 6-46.
Load
Distance
[13] Load High Limit
[14] Target Load
[31]
Distance
Low Limit
[32]
Distance
High Limit
[62]
Press Time
(Control)
Final Judgment Zone
[20] Time Start Load
[12] Load Low Limit