FEC DSP1500 (SAN3) User Manual

Page 49

Advertising
background image

enFORCE

DSP1500 SAN Unit Operation Manual

PAGE 4-9 (Rev.

4)

Chapter 4: System Setup and Wiring

4.6 Pre-Amplifier Connection

The pre-amplifier connector links the SAN controller to the tool load cell in order to perform the
following functions:

1. Reads the load voltage values from the pre-amplifier.
2. Tests the pre-amplifier condition by generating a voltage signal for full scale load by the

Calibration function.

3. Tests the Pre-amplifier Zero level by the Zero Level Check function.

See Section 4.13 and Appendix A for connecting cable part numbers and specifications.



Wiring Chart

1: (SCL) Signal Clock 5: Frame Ground

2: (SDA) Signal Data 6: Ground

3: (CAL) Calibration

7: -12VDC

4: Load Input

8: +12VDC


Mating Connector

Manufacture:

Molex

Housing Part No.:

39-01-2085

Contact Part No.:

39-00-0047 (Qty.-8)




























Advertising