2 installation of the detector (model zr22g-015), 1 installation location, 5 pipinf for blowback – Yokogawa Multi Channel Oxygen Analyzer System ZR22/AV550G User Manual

Page 72

Advertising
background image

IM 11M12D01-01E

4-6

4.1.5

Pipinf for Blowback

This piping is required when the blow back function is carried out. The piping described
below provides automatic blow back operation when the “ blow back start “ command is
entered to the converter.

Pipe coupling

Blow pipe

Blowback air

Regulator valve

F4302.EPS

Solenoid valve

Solenoid valve

If blowback is done under control of a
contact output from the averaging
converter, a hold is placed on analog
output signals from all detector while
blowback is in progress.
See Section 10.5 for details on the
blowback function. Wiring for solenoid
valves is described in Section 5.3.

Note

Figure 4.6 Blowback Piping

The following parts are required for blow back piping.

• Blow pipe (to be prepared as illustrated in Figure 4.7.)
• Two-way solenoid valve: “ Open “ when electric current is on. (Found on the open

market)

• Air set (recommended by YOKOGAWA, G7011XF / E7040EL or G7004XF / K9473XG)

<Blow pipe manufacturing>
Manufacture the blow pipe as illustrated in Figure 4.7, and mount it on the high-
temperature probe adapter.

Approximately
200

Rc1/4

Blind flange of the adapter for
high temperature probe

Welded

8 (O.D.) by 6 (I.D.) Stainless steel pipe

F4.11E.EPS

Unit : mm

Figure 4.7 Blow pipe Construction