2-26

< Pressure setting for the auxiliary ejector for high-temperature use >
Pressure supply for the auxiliary ejector should be set so that the suction flow of the
measured gas becomes approximately 5 l/min.

To set this, proceed as follows:

(1) In Graph 4, draw a horizontal line from the 5 l/min point. on the vertical axis

(Suction flow: Qg) toward the gas pressure line to be used, to find the point of
intersection.
Draw a line vertically down from the point of intersection to the axis to find the
drive pressure, P (at the ejector entrance).

(2) In Graph 1, determine Po (pressure setting) from L (the distance between the ejector

and the pressure gauge).

(3) Open the needle valve to supply air for the ejector to the pressure gauge until it

indicates the pressure setting, Po.

Note

Qg (the suction flow) may require change according to the conditions of use. Refer to
Section 3.2.2 and Section 4.1.5 for details.

Graph explanation
1) Graph 1 is to compensate for pressure loss in piping between the ejector and the

pressure gauge, and find Po (pressure setting).

2) Graph 2 shows correlation between P (drive pressure) and Qa (air consumption).
3) Graph 3 shows correlation between P (drive pressure) and Pg (suction pressure; when

the measured gas inlet of the ejector is closed).

4) Graph 4 shows correlation between P (drive pressure) and Qg (suction flow) for each

gas pressure.