Piping, Warning – Yokogawa Single Channel Oxygen Analyzer System ZR22/ZR402 User Manual

Page 70

Advertising
background image

IM 11M13A01-02E

4-1

4. Piping

4.

Piping

This chapter describes piping procedures based on two typical system configurations for
EXAxt ZR Separate-type Explosionproof Zirconia Oxygen Analyzer.

• Ensure that each check valve, stop valve and joint used for piping do not allow

leakage. Especially, if there is any leakage of the calibration gas from pipes and joints,
it may cause clogging of the pipes or incorrect calibration.

• Be sure to conduct leakage test after piping.
• Basically, apply instrument air (dehumidified by cooling to the dew point -20

Њ C or

lower, and removing any dust, oil mist and the like) for the reference gas.

WARNING

Do not loosen or remove any Flame Arrester of gas inlet/outlet during piping. The
detector modification or parts replacement by other than authorized representative of
Yokogawa Electric Corporation is prohibited and will void ATEX Flameproof
Certification, Factory Mutual Explosionproof Approval and Canadian Standards
Explosionproof Certification.

Flame Arrester

F4.0E.EPS

Advertising