Inspection and maintenance, 2 replacing the sensor assembly -3, Caution – Yokogawa Single Channel Oxygen Analyzer System ZR22/ZR402 User Manual

Page 173

Advertising
background image

IM 11M12A01-03E

11-1

11.

Inspection and Maintenance

11. Inspection and Maintenance

This chapter describes the inspection and maintenance procedures for the EXA

XT

ZR

Zirconia High-temperature Humidity Analyzer to maintain its measuring performance

and normal operating conditions.

CAUTION

When checking the detector, carefully observe the following:
(1) Do NOT touch the probe if it has been in operation immediately just before being

checked. (The sensor at the tip of the probe heats up to 750

Њ C during operation. If

you touch it, you will get burned.)

(2) Do not subject the probe to shock or cool it rapidly.

The sensor is made of ceramic (zirconia). If the detector is dropped or bumped into
something, the sensor may be damaged and no longer work.

(3) Do not reuse a metal O-ring to seal the cell assembly. If you replace the cell or

remove it from the probe for checking, be sure to replace the metal O-ring. Other-
wise, the furnace gas may leak, and then the leaking corrosive gas will cause the
built-in heater or thermocouple to go open circuit, or the detector may corrode.

(4) Handle the probe with care so that the dust-filter mounted screws on the tip of the

probe do not hurt your finger(s).

(5) Before opening or closing the terminal box, first remove dust, sand, or the like from

the terminal box cover.

Advertising