3 installation of za8f flow setting unit, 1 location, 2 mounting of za8f flow setting unit – Yokogawa Single Channel Oxygen Analyzer System ZR22/ZR402 User Manual

Page 54: Installation of za8f flow setting unit -7, Location -7, Mounting of za8f flow setting unit -7

Advertising
background image

IM 11M12A01-03E

3-7

3. Installation

3.3

Installation of ZA8F Flow Setting Unit

3.3.1

Location

The following should be taken into consideration:

(1) Easy access to the unit for checking and maintenance work.
(2) Near to the detector and the converter for operating keys on the panel.
(3) No corrosive gas.
(4) An ambient temperature of not more than 55

ЊC and little changes of temperature.

(5) No vibration.
(6) Little exposure to rays of the sun or rain.

3.3.2

Mounting of ZA8F Flow Setting Unit

The flow setting unit can be mounted either on a pipe (nominal JIS 50A) or on a wall. It
should be positioned vertically so that the flowmeter works correctly.

<Pipe Mounting>
(1) Prepare a vertical pipe of sufficient strength (nominal JIS 50A: O.D. 60.5 mm) for

mounting the flow setting unit. (The unit weighs approximately 2 to 3.5 kg.)

(2) Mount the flow setting unit on the pipe by tightening the nuts with the U-bolt so that

the metal fitting is firmly attached to the pipe.

F3.8E.EPS

Figure 3.8 Pipe Mounting

Advertising