3. Product description

Festo P.BE-CMMD-AS-HW-EN 1002NH

59

T

Transition condition

Actions of the user

T1

RESET / Power ON

T2

Time out has expired or the firmware download is
complete.

T3

The initialisation has been carried out successfully.

T4

DIN4=1 and DIN5=1

T5

"Torque control" was selected in the commissioning
software.

Setpoint specification via AIN0/AGND

T6

"Speed control" was selected in the commissioning
software.

Setpoint specification via AIN0/AGND

T8

"Positioning" was selected in the commissioning
software.

Set selection via
DIN0 … DIN3, DIN10, DIN11
Start for the positioning process:
DIN8=1

T9

All parameters for the jog mode were set in the
commissioning software
(e.g. max. speed, acceleration ...).

Selection I/O mode:
DIN9=0, DIN12=1
Jog +: DIN10=1
Jog –: DIN11=1

T10

Selection I/O mode:
DIN9=0, DIN12=1

T11

Selection of the homing method and parametrisation of
the speeds and accelerations in the commissioning
software.

Selection I/O mode: 0
DIN9=0, DIN12=0
Selection of positioning record 0
Start for positioning process:
DIN8=1

T12

Drive is referenced.

T13

DIN5=0

T15

DIN5=0

T16

DIN5=0

T17

DIN4=0

T18

Write or read request to SD card such
as:
Load parameters
- Save parameters
- Firmware download.

T19

The SD card was initialised successfully.

T20

"Load from SD after restart" was selected in the
commissioning software.

T21

Parameter record was loaded.

T22

A fault has occurred which causes the end stage to be
switched off

T23

T24

Edge controlled fault acknowledgement
DIN5: 1 – 0

T25

The error was acknowledged and no other errors are
pending.

Table 3.17 I/O sequence control