Timing diagram, sto, 2 timing diagram, sto, Fig. 4.2 timing diagram, sto 2 – Festo Контроллер двигателя CMMD-AS User Manual

Page 81

Advertising
background image

4. Functional safety engineering

Festo P.BE-CMMD-AS-HW-EN 1002NH

81

4.2.2

Timing diagram, STO

t1

t2 t3

t5 t6

t7

t8

t10

t11

t12 t13

t9

t4

t

t

t

t

t

t

t

t

t

Triggering of pulse amplifier supply relay (optocoupler driver)

Supply of pulse amplifiers (optocoupler driver)

“ON“ (15V)

“OFF”

open

closed

“ON”

Timing of output

stage enabling

variable

Internal output stage enabling
(controlled by µP)

Set speed "n"

n=0

n

“H”

“H”

“H”

Seven-segment

display

Delay until brake is
released!

2. shut-down path

1. shut-down path

Discharge curve of
electrolytic capacitors for the
supply of the pulse amplifiers

“OFF”

“ON”

“OFF”

Ramp can be set via

Festo Configuration Tool

„FCT“

fixed

(0V)

Can be set via

Festo Configuration Tool „FCT“

Releasing motor holding brake (X6.Y.1/2)

released

(24V)

Controller enabling (X1.Y, DIN5)

Output stage enabling (X1.Y, DIN4)

Floating feedback contact for driver supply
(X3.Y.5/6)

Timing for activation of "Safe
Torque off" with safety
switchgear PNOZ.

"Safe Torque off"

X3.Y.2 (0V)

X3.Y.2 (24V)

"Safe Torque off"

tx


tx

= 1.6 ms (controller cycle time)

Y

= 1 / 2, depending on the axis

14535d_1

Fig. 4.2 Timing diagram, STO

2





































Advertising