Timing diagram switch-on sequence, 7 timing diagram switch-on sequence – Festo Контроллер двигателя CMMD-AS User Manual

Page 118

Advertising
background image

7. Preparations for commissioning

118

Festo P.BE-CMMD-AS-HW-EN 1002NH

7.7

Timing diagram switch-on sequence

Power On

DOUT3: #ERROR

Controller release

Output stage

switched on

Holding brake

released

Speed Setpoint

Speed actual value

t1

t2

t3

DOUT0: READY

t4

Output stage

release

t2

t2

t1

approx. 500 ms Execution of boot program and application start

t2

> 1.6 ms

t3

= 10 ms

Dependent on the operating mode and the status of the drive

t4

= N x 1.6 ms

Can be parametrised (brake parameter run start delay tF)

Fig. 7.1 Timing diagram switch-on sequence