Lenze 2130IB User Manual

Page 57

Advertising
background image

55

Controller states

Meaning

NOT READY TO SWITCH ON

The controller is being initialized and is not yet
ready to operate. It then switches automatically to
the state "READY TO SWITCH ON".

READY TO SWITCH ON

The controller is inhibited (RSP) and waits for the
power stage to be charged. It then changes
automatically to the state "SWITCHED ON".

SWITCHED ON

The controller is inhibited and waits for controller
enable.

OPERATION ENABLED

The controller is enabled (RFR). In this state, a
pulse inhibit is possible at any time.

MALFUNCTION

The controller is in the state "MALFUNCTION"
(TRIP).

Advertising