Detail Drive Configuration and Operation

Chapter 1

9.

Select (P 1055 SL Dir Real Rx0) in the Selected Parameters list.

10.

Click OK.

Note that by linking to [Spd Ref Bypass] of the follower, the ramp and S-Curve
of the follower were bypassed. This is because the reference is already ramped and
S-Curved by the master. This way, both drives follow exactly the same ramp.

Cycle Power

You must power down all drives before SynchLink changes take effect.

1.

Remove power from all drives.

2.

Apply power to the Master.

The SynchLink LED should be solid green. The SynchLink LED is on the
top right of the MCB and is visible through the window on the control
assembly.

3.

Apply power to the follower(s).

The SynchLink LED on the follower should be a solid light after about 1
minute.