30 amp – Hypertherm HD3070 Plasma Arc Cutting System w/ Automatic Gas Console User Manual

Page 115

Advertising
background image

4-26

HD3070 with Automatic Gas Console

Instruction Manual

16

OPERATION

PAC186

Stainless Steel##

Air Plasma / Air Shield

30 Amp Cutting

Shield
020941

Nozzle
020938

Electrode
120113

Retaining Cap
020940

Swirl Ring
020937

PAC186 Torch
120349

Shield Cap
020634/020687

Material

Thickness

(GA)

(in)

(mm)

Arc

Voltage

***

(volts)

Torch

Standoff

**, ***

(in)

(mm)

Travel

Speed

(ipm)

(m/min)

Pierce

Delay

(dial)

(sec)

Initial

Piercing

Height

(in)

(mm)

27

0.016

0.4

75

0

30

0

60

70-75

0.020

0.5

250

6.35

0.040

1.0

0

0

24

0.024

0.6

75

0

30

0

60

70-75

0.020

0.5

220

5.59

0.040

1.0

0

0

22

0.030

0.8

75

0

30

0

60

70-75

0.020

0.5

200

5.08

0.040

1.0

0

0.1

20

0.036

0.9

75

0

30

0

60

70-75

0.020

0.5

180

4.57

0.040

1.0

0

0.1

18

0.048

1.3

75

0

30

0

60

73-78

0.020

0.5

150

3.81

0.060

1.5

.5

0.2

16

0.060

1.5

75

0

30

0

60

73-78

0.020

0.5

120

3.05

0.060

1.5

.5

0.2

Air inlet pressures must be between 105 - 135 psi (7.2 - 9.2 bar) for all material thickness.

#

Refer to LCD display Figure 4-3.

##

Stainless steel plate sometimes comes with a protective plastic film. Remove film prior to cutting.

* Slightly increasing the test preflow Air flowrates may increase piercing capability on the thicker materials listed above.

However, increasing the preflow flowrates too much may affect plasma starting reliability (misfiring).

** Torch standoff tolerances are ± 0.005 inch (± 0.125 mm). When using a THC, tolerances are ± 1 volt.

*** To maintain the 0.020 inch (0.5 mm) torch standoff as the electrode wears, the arc voltage may have to be increased to

avoid having the torch dive into the plate.

Counter clockwise (CCW) consumables are available for mirror image cutting. Refer to Section 6, Parts List.

If problems occur with the cutting process, and the flowrates are suspect, refer to Section 5, Maintenance, Gas System Back
Pressure Checks.

Test Cut

Flowrates (%)

Shield

Air
(3)

#

(4)

#

Plasma

Air
(5)

#

(6)

#

Test Preflow*

Flowrates (%)

Preflow

Air
(1)

#

(2)

#

Advertising