5 • service – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 129

Advertising
background image

5 • Service

Doc. 065291-01 3/09

117

8. Also verify that the two splines on the pod align with the matching splines

inside the valve holder (see

Figure 5-12

). If necessary, twist the end of the pod

to adjust the position of the splines.

9. Push the pod into the holder until it clicks into place. Replace the black

locking ring.

10. Reconnect all liquid lines to the valve.

11. Turn on the pump flow. Check for leaks from the valve. Tighten fittings as

required (see

Section 5.1.1

).

12. Close the door.

Figure 5-12. Valve Pod and Pod Holder

Slot (larger)

Splines

Runner (larger)

Valve Pod

Valve Holder

Advertising