Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 192

Advertising
background image

ICS-2100 Ion Chromatography System

180

Doc. 065291-01 3/09

1. Locate the yellow 0.5 mL/min, 7 MPa (1000 psi) backpressure coil

(P/N 053765) and a 10-32 to 10-32 coupler (P/N 042627) in the ICS-
2100 Ship Kit (P/N 064375).

2. Use the coupler to connect one end of the backpressure coil to the

TO

INJ VALVE IN - P/ELUENT OUT

line.

3. Connect the other end of the backpressure coil to the coupler on the

mixer inlet.

NOTE The backpressure coil connection is temporary;

it is required only during initial filling of the
mixer.

4. Direct the mixer outlet to a temporary waste container, such as a

beaker.

5. Verify that the suppressor and the auxiliary electrolytic device (if

installed) are off.

6. Verify that the

Automatically turn on with pump

option is not

selected on the ICS-2100 touch screen

SUPPRESSOR

page (see

Section B.9

). Disabling this option lets you turn on the pump, without

automatically turning on the suppressor.

7. From the ICS-2100 Control panel in Chromeleon or the touch screen

HOME

page, set the pump flow rate to the rate required for the

application.

8. Turn on the pump.

9. Verify that the system backpressure is between 14 and 16 MPa (2000

and 2300 psi). If necessary, adjust the pressure by adding or removing
backpressure tubing.

10. From the Chromeleon Control panel or the touch screen

ELUENT

GENERATOR

page, set the

EGC-1

concentration to the value required

for your application.

11. Turn on the

EGC-1

current.

To avoid damaging the suppressor and auxiliary electrolytic device (if
installed), always turn them off before filling the mixer. The pump flow
is on during filling; however, no flow reaches the suppressor or
auxiliary electrolytic device.

Advertising