Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 193

Advertising
background image

5 • Service

Doc. 065291-01 3/09

181

12. Run at these settings until a consistent flow of eluent is exiting the

mixer outlet. At a flow rate of 1 mL/min it will take about 16 minutes
to fill a 4-mm mixer and about 5 minutes to fill a 2-mm mixer.

NOTE The void volume of the 4-mm mixer is about

16 mL. The void volume of the 2-mm mixer is
about 5 mL.

13. Turn off the

EGC-1

current.

14. Turn off the pump.

15. Remove the backpressure coil from the

TO INJ VALVE IN - P/ELUENT

OUT

line and the mixer inlet.

16. Retain the coupler on the mixer inlet.

17. Reconnect the

TO INJ VALVE IN - P/ELUENT OUT

line to the coupler on

the mixer inlet.

18. Reconnect the mixer outlet line to port

P

(

2

) on the injection valve.

Advertising