Ics-2100 ion chromatography system, Filling the egc co, Mixer with carbonate/bicarbonate eluent – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 194: Mixer with carbonate/bicarbonate

Advertising
background image

ICS-2100 Ion Chromatography System

182

Doc. 065291-01 3/09

Filling the EGC CO

3

Mixer with Carbonate/Bicarbonate Eluent

Figure 5-71

illustrates the liquid flow path through the eluent generator

components during initial filling of the EGC CO

3

Mixer with

carbonate/bicarbonate eluent.

Figure 5-71. Plumbing for Initial Filling of the EGC CO

3

Mixer with

Carbonate/Bicarbonate

EGC

IN

TO DEGAS

ELUENT OUT

WASTE,

GAS

SEPARATOR

TO INJ

VALVE IN - P/

ELUENT OUT

TO DEGAS

ELUENT IN

EGC

DEGAS

Connect to

Gas Separator

Assembly

Pre-plumbed

Pump Pulse

Damper

to

EGC CO

Mixer

3

TO CR-TC/EPM

REGEN IN

(orange)

TO PUMP/

DAMPER

TO CR-TC/EPM

ELUENT OUT

(yellow)

TO

C

R-

TC

/E

PM

RE

GE

N

OU

T

(b

lue

)

EPM

E

L

UENT

I

N

T

O

C

R

-TC

/E

P

M

E

L

U

E

N

T

IN

(r

ed

)

EGC
OUT

(yellow)

(blue)

(red)

TO EGC CO3

MIXER IN

TO INJ VALVE

PORT P

TO EGC CO3

MIXER OUT

TO SRS/AES

REGEN OUT

Back-

Pressure

Coil*

*

14 MPa (2000 psi)

at 1.0 mL/min

From the EluGen
cartridge outlet port

To the EluGen

cartridge inlet port

Advertising