5 • service – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 203

Advertising
background image

5 • Service

Doc. 065291-01 3/09

191

4. Thread the three lines from the EPM (red, yellow, and blue labels)

through the opening on the side of the new holder (see

Figure 5-80

).

5. Turn the new EGC holder

upside down (see

Figure 5-81

).

NOTE To help retain the

fittings and ferrules
on the lines, remove
the coupler from each
line just before
connecting the line to
a port.

Figure 5-81. EGC Holder (upside down)

6. Connect the lines from the EPM (red, yellow, and blue labels) to the

corresponding lines in the holder.

7. Disconnect the line labeled

TO CR-TC/EPM REGEN IN

(orange label)

from the

REGEN IN

port on the EPM and connect the new

TO CR-

TC/EPM REGEN IN

line (orange label) to the

port.

Figure 5-80. TO CR-TC/EPM Lines Outside of Holder

TO CR-TC/EPM
ELUENT OUT
(yellow label)

TO CR-TC/EPM

ELUENT IN

(red label)

TO CR-TC/EPM

REGEN OUT

(blue label)

Advertising