GE Industrial Solutions Entellisys System User Manual User Manual

Page 226

Advertising
background image

Alarms and events

226

A

CPUB Synch Clock OK

Messenger reports that CPU B is using the
CPU Synch Clock (event recorded by CPU A)

Caution CPUA Synch Clock Err
Backup Clock On

Messenger reports that CPU A is not using
the CPU Synch Clock (event recorded by CPU
B)

Verify that CPU A is connected to the CPU
Synch Clock, verify that the CPU Synch Clock
is operating correctly.

Caution CPUB Synch Clock Err
Backup Clock On

Messenger reports that CPU B is not using
the CPU Synch Clock (event recorded by CPU
A)

Verify that CPU B is connected to the CPU
Synch Clock, verify that the CPU Synch Clock
is operating correctly.

Messngr Synchronization OK

Messenger reports that it has successfully
synchronized to one of the CPUs

Messngr Synch Not Locked

Messenger reports that it is not synchronized
to either CPUs

It is normal for this to occur during start-up,
or when an Entellisys Messenger is first
plugged in to the system or rebooted. If it
occurs repeatedly during normal operation,
contact GE Post Sales Service (see

How to

contact us on page 2

).

Breaker Tripped Analog IOC

Messenger reports that it has tripped the
breaker due to an IOC condition (analog
circuit)

Breaker Trip Instantaneous
Overcurrent

Messenger reports that it has tripped the
breaker due to an IOC condition

Breaker Trip Backup ST
Overcurrent

Messenger reports that it has tripped the
breaker due to a short time overcurrent
condition

Breaker Trip Backup LT
Overcurrent

Messenger reports that it has tripped the
breaker due to a long time overcurrent
condition

Breaker Trip Backup Ground
Fault

Messenger reports that it has tripped the
breaker due to a ground fault condition

Caution CPUA Not Rcv From 1 Or
More Messngrs

Messenger reports that CPU A is not receiving
data from at least one Messenger (event
recorded by CPU B)

Check Ethernet connection between
Entellisys Messenger and switch, and the
connection between the switch and the
CPU A. Verify that Messenger is powered on
and operating.

Caution CPUB Not Rcv From 1
Or More Messngrs

Messenger reports that CPU B is not receiving
data from at least one Messenger (event
recorded by CPU A)

Check Ethernet connection between
Entellisys Messenger and switch, and the
connection between the switch and the
CPU B. Verify that Messenger is powered on
and operating.

Caution Messngr Not Receiving
From CPUA

Messenger reports that it is not receiving
data from CPU A

Check Ethernet connection between
Entellisys Messenger and switch, and the
connection between the switch and the
CPU A. Verify that CPU A is powered on and
operating.

Table A-2 Sequence of events description and troubleshooting guide

Event

Description

Notes and Troubleshooting tips

Advertising