GE Industrial Solutions Entellisys System User Manual User Manual

Page 233

Advertising
background image

Alarms and events description and system troubleshooting guide

233

A

Breaker Status

Attention Breaker Open Failed
Shunt Trip

CPU sent an open with shunt trip command
to Messenger, but data sent by Messenger
indicates that breaker did not open

• Verify that breaker is in the Test or

Connect position.

• Check shunt trip fuse.
• Contact GE Post Sales Service (see

How

to contact us on page 2

).

Attention Breaker Close Failed

CPU sent a close command to Messenger,
but data sent by Messenger indicates that
breaker did not close

• Verify that breaker is in the Test or

Connect position.

• Verify that breaker is an electric breaker.

If it is, verify that closing spring is
charged, also check the fuse for the
charging motor.

• Contact GE Post Sales Service (see

How

to contact us on page 2

).

Attention Breaker Trip Failed
Shunt Trip

CPU sent a trip with shunt trip command to
Messenger, but data sent by Messenger
indicates that breaker did not open

• Verify that breaker is in the Test or

Connect position.

• Check shunt trip fuse.
• Contact GE Post Sales Service (see

How

to contact us on page 2

).

Attention Breaker Open Failed
Flux Shifter

CPU sent an open with flux shifter command
to Messenger, but data sent by Messenger
indicates that breaker did not open

• Verify that the breaker is in the Test or

Connect position.

• Contact GE Post Sales Service (see

How

to contact us on page 2

).

Attention Breaker Trip Failed
Flux Shifter

CPU sent a trip with flux shifter command to
Messenger, but data sent by Messenger
indicates that breaker did not open

• Verify that the breaker is in the Test or

Connect position.

• Contact GE Post Sales Service (see

How

to contact us on page 2

).

Breaker Opened

Breaker has opened

Breaker Closed

Breaker has closed

Breaker Lockout

Breaker is locked out

Breaker Closing Spring Charged

Breaker closing spring is charged

Breaker Primary Connected

Breaker primary is connected

Breaker Primary Disconnected

Breaker primary is disconnected

Breaker Secondary Connected

Breaker secondary is connected

Breaker Secondary
Disconnected

Breaker secondary is disconnected

Breaker Tripped

Breaker has tripped

Table A-2 Sequence of events description and troubleshooting guide

Event

Description

Notes and Troubleshooting tips

Advertising