Chapter 3 - installation and wiring, Installation and wiring, Chapter 3 – Rockwell Automation 160 DEVICENET (DN1) MODULE FRN 1-2.XX User Manual

Page 16

Advertising
background image

Publication 0160-5.5 - September 1997

Chapter

3

Installation and Wiring

This chapter contains information necessary to:

Meet the requirements of the EMC and Low Voltage directives
for CE compliance.

Remove a preinstalled Program Keypad Module or Ready/Fault
Indicating Panel.

Configure the Communication Module.

Install the DeviceNet Communication Module.

Wire the DeviceNet communication cables.

Remove the DeviceNet Communication Module from the drive.

Read this chapter completely before you attempt to install or config-
ure your Communication Module. Before you apply power, review
the Attention statements on page P-3 and P-4 in the Preface and
ensure that all connections are secure and that all selections are cor-
rect.

!

ATTENTION: When you make changes to the switch
settings, use a pointed instrument such as a ball point
pen. Do not use a pencil because damage may occur.

!

ATTENTION: Unpredictable operation may occur if
you fail to check connections and DIP switch settings
for compatibility with your application. Unpredictable
operation may result in personal injury, death, and
equipment damage.

Advertising