Required-attendance time-periods – Interlogix VEREX Director User Manual

Page 24

Advertising
background image

16

Verex Director V4.9.1 User's Guide

21-0381E v4.9.1

Attendance Periods

Attendance periods are weekly blocks of time
that allow time & attendance reports to 'know'
when users are supposed to be in the facility.

Schedules for cardholder access must span a larger
period of time than the applicable attendance period--to
let people enter the facility before their shift begins, and
leave after it ends.

Adding (Setting up) an Attendance
Period

Select

Attendance Period

from your MyTools

bar, or click

[Reports]

in the 'tree', open the

Time and Attendance

branch, and select

Attendance Period

.

Multi-Account Systems: Select the desired account
near the centre of the screen. Tip: This option
appears only if you didn't already have an account
'open' in the tree.

Now, click

[+]

at the bottom of the form, or

right-click the form, and select

Add New

from

the pop-up menu.

Alternative: You can also select a blank/grey item from
the list (bottom of the form). Note: Grid view does not
apply to this screen.

The attendance period is shown graphically,
for Sunday through Saturday. Add a new time-
interval by right-clicking a specific day, and
selecting

Create New Time Interval

.

Then, drag the interval and/or its end-points to
the desired location. Tip: Copying, pasting,
and deleting is also allowed when you right-
click a specific time-interval.
Repeat this process until the desired times are
set up for all days in the attendance period.
(You can use up to 6 unique time intervals
throughout each schedule.)
Now refer to the selection-descriptions for this
screen for additional information.

Tip: You can copy all settings for an attendance
period, and paste them into another one: In the 1

st

one,

right-click near the bottom of the form, and select Copy.
Then, select a blank/new attendance period from the
list, right-click near the bottom of the form, and select
Paste. After 'pasting', change the name and any
settings as desired. Note: 'Copy' and 'Paste' are also
available from the Edit menu.

Viewing or Changing Settings for a
Required-Attendance Period

Select

Attendance Period

from your MyTools

bar, or click

[Reports]

in the 'tree', open the

Time and Attendance

branch, and select

Attendance Period

.

Multi-Account Systems: Select the desired account
near the centre of the screen.

Now, choose the desired attendance period
from the list (bottom of the form), and refer to
the selection-descriptions for this screen while
viewing and/or changing settings as desired.

Deleting an Attendance Period

Select

Attendance Period

from your MyTools

bar, or click

[Reports]

in the 'tree', open the

Time and Attendance

branch, and select

Attendance Period

.

Multi-Account Systems: Select the desired account
near the centre of the screen.

Now, choose the desired attendance period
from the list (bottom of the form). Then, right-
click a blank area near the bottom, and select

Delete

. When asked to confirm, choose

Yes

.

Required-Attendance Time-Periods

Advertising