Ip connectivity, Secure ip communications (  v4.72), Operation – Interlogix VEREX Director User Manual

Page 331: Requirements, Set-up overview

Advertising
background image

21-0381E v4.9.1

Welcome Report Control Admin Sys

Config

Tech-Ref

323

Secure IP Communications
(

V4.72)

Introduction

VEREX Director systems support
communications through a secure IP
connection.
This can be:

 Utilized through a network, or

via the internet.

 Used for central monitoring

(HSC-IP), panelPC
communications, and/or
client/server communications.

Operation

General

Secure IP communications is encrypted, and
allows the use of validation certificates for
additional security. Certificate problems may
be logged as an alarm/event, and also in the
Windows event viewer.

For Client/Server Operation

Server validation certificates are checked
when each operator logs in (and when the
communications service starts up). If there is
a problem with the certificate, the operator will
be notified, and given these choices:

If You Are Prompted about a Certificate Problem
Continue:
To allow logging in--temporarily ignoring
any problem with the server certificate.
Continue, and don't ask me again: If you will not be
using validation certificates for now. Tip: This will be
reset when a server certificate is assigned.
Stop: To abort the login due to a suspect validation
certificate.

For Communications and Monitoring

Communications certificates are checked
whenever a panel connection is attempted.

Similarly, HSC-IP monitoring certificates are
checked whenever an IP connection to the
receiver is attempted.
IP modules can be set to ignore validation
certificates. Otherwise, communications for an
invalid network location will be blocked.

Requirements:

Software and Firmware versions:

Panel Wiring: Each system panel must

have its own IP board. (Panels cannot be
chained together on one IP board.)
(Although--with software and firmware
versions indicated above--a single HSC-IP
module can be used for both features at
the same time.

Networking Ports: The Director software

requires exclusive access to port 443, and
this port must NOT be blocked on the
network.

Set-up Overview:

Hardware: The IP module (and receiver)

must be set up--as applicable. Refer to
the documentation for the specific version
of IP module or receiver.

e.g., HSC-IP Module v4: 21-3691x
e.g., R1000 Receiver: 21-3690x

IP Connectivity

Item Client/Server

via

Secure IP

PanelPC
via Secure IP

Monitoring via
HSC-IP

Director
software

V4.70 (w/o cert's)
v4.72 (full)

 V4.72

 V4.72

IP Module
firmware

n/a HSC-IP

module
V4.0

HSC-IP module
V4.0

Panel
Firmware

n/a

V4.40

V 4.49

Receiver

(Central Station)

n/a n/a

R1000
receiver
(check for
latest firmware)