Pilz PSSnet SHL 8T MRP User Manual

Page 130

Advertising
background image

Network load control

PSSnet SHL - Basic Configuration

Pilz GmbH & Co. KG, Felix- Wankel Str. 2, 73760 Ostfildern

8.5 Flow control

131

Figure 35: Example of flow control

„

Flow control with a full duplex link

In the example

(see fig.

35)

there is a full duplex link between Workstation

2 and the device.
Before the send queue of port 2 overflows, the device sends a request to
Workstation 2 to include a small break in the sending transmission.

„

Flow control with a half duplex link

In the example

(see fig.

35)

there is a half duplex link between Worksta-

tion 2 and the device.
Before the send queue of port 2 overflows, the device sends data back so
that Workstation 2 detects a collision and interrupts the sending process.

Switch

Port 3

Port 2

Port 1

Port 4

Workstation 1

Workstation 2

Workstation 3

Workstation 4

Advertising
This manual is related to the following products: