Nortel Networks 1000E User Manual
Page 247
Advertising
Configuring the IPMG
Page 247 of 466
Communication Server 1000E
Installation and Commissioning
5
Click Save. It does not become available until a loop number has been
entered and TAB has been used to move the cursor.
The following message box appears:
Figure 119
Confirmation
6
Click OK to complete the configuration.
The updated loop configuration page appears (see Figure 120). The new
Conference loop is displayed.
Figure 120
Loop configuration (updated)
End of Procedure
Advertising