Procedure 4 installing an ntdu6201 ground bar, Figure 20 on – Nortel Networks 1000E User Manual
Page 94
Advertising
Page 94 of 466
Installing system grounds
NN43041-310
Standard 01.11
October 2008
Figure 20
NTBK80 Ground Bar
End of Procedure
Follow Procedure 4 to install an
NTDU6201
Ground Bar.
Procedure 4
Installing an NTDU6201 Ground Bar
1
Place the NTDU6201 Ground Bar near the equipment.
Note: The ground bar is a bridging point for ground wires from up to
48 components.
Advertising