IAI America ACON-CG User Manual

Page 122

Advertising
background image

108

7. Operation <Practical Steps>

7.9.1

Judgment Method of End Position

Although completion judgment is based on the applicable count managed by the PLC, the zone output signal
can be used additionally to double-check the completion of movement.
Program the PLC so that the ON/OFF status of the zone output signal is checked when positioning is completed,
and if the signal is OFF, the applicable position will be determined as the last work part position.
If the count in the PLC does not match the zone output signal status, signal timings may not be synchronized.

29.5 mm

190.5 mm

200 mm

Zone output signal

Position No. 1

10-mm

pitch

Last load

The coordinate immediately before the last
load is set as the positive-side boundary.

Advertising
This manual is related to the following products: